Major repairs of a section of Lukyanovsky of rain water drain collector and household water drain collector along Dmitrievsky Street, 38-40. Concern’s Project Sites
Major repairs of a section of Lukyanovsky of rain water drain collector and household water drain collector along Dmitrievsky Street, 38-40. Construction of reliable engineering networks in a zone of future construction, adjustment of networks, and area preparation under construction of the pile foundation in the conditions of dense city construction on a tight timetable. The plastic pipes strengthened by fiberglass were for the first time used in Ukraine. In the course of major repairs of the Lukjanovsky collector section there have been constructed: Taking into account the technological and geological components, construction water level reduction was carried out by deep pumps in 20 and 22 m deep boreholes. |
|