Construction of pressure head sewer pipeline from the "Pushcha - Voditsja" Sewer Pump Station to Gazoprovodnaya Street in the Obolonsky District of Kyiv City
Concern’s Project Sites

Construction of pressure head sewer pipeline from the "Pushcha - Voditsja" Sewer Pump Station to Gazoprovodnaya Street in the Obolonsky District of Kyiv City

Construction period: June 2006  - December 2010

Collector total length – 6 479,5 m.

Gravity water drain of  D 350 and 150 mm is laid in the open.
The pressure head collector is constructed by using three methods:
- method of horizontal directed drilling (in the conditions of natural landscape preservation), Vermeer Navigator D36x50 installation, D 560 mm polyethylene pipes,
- method of driving (under tram tracks and under the highway), D 560 mm polyester pipes in D 1 220 mm casing
- by the open method.
Works are conducted under the safeguard of water level reduction.

Construction is provided of 40 viewing wells.

 
 
 
Detailed contact information
Question to the expert
Site map

© «Concern «KyivPidzemShlyakhBud», 2009
Site is created by ADV-DVA Company in 2009
Support and Promotion by WebPromotion
«Concern «KyivPidzemShlyakhBud»
Tel.:+380 (44) 253-00-02
tel: +380 (44) 253-00-31
office@kpsb.com.ua