Construction of a new sewer collector along Syretsky Street – І-st and ІІ-nd turns.
Construction period: July 2001 – December 2009
Total amount of work - construction of various pipelines of 2 046 m long.
There are applied:
- microtunnelling technology with the use of AVN 1200 C tunnel-driving complex;
- open method with the use of shield linear sheeting of Emunds und Staudinger GmbH company manufacture.
The main collector consists of D1200mm reinforced concrete pipes.
Construction also provides for:
- connections to an operating sewer collector;
- rain water drain;
- gas pipeline of D 200 mm steel pipes;
- heating system of heat and hydro insulated pipes of D 76/140 mm;
- extinguishing chambers, viewing wells and three sewer pump stations.
All works are conducted under the safeguard of water level reduction and soils freezing.