Re-laying of a pressure head sewer collector from a pump station of Svyatoshino Residential Area to Chumakovsky gravity collector
Concern’s Project Sites

Re-laying of a pressure head sewer collector from a pump station of Svyatoshino Residential Area to Chumakovsky gravity collector

Construction period: December  2005 – December 2010
Collector total length – 6 567, 5 m.
The complicated collector’s route passes through the built up territory, crosses a metro line and rail tracks. In the course of construction, various technologies are combined for laying of engineering networks.
Considerable part of collector is constructed in the open. There are used linear sheeting manufactured by Emunds und Staudinger GmbH company (Germany).

Diameter of collector pipes are 1000 mm.
It is also provided:
- laying of the pipeline of  D1200 mm reinforced concrete pipes on a depth of  20 m (under rail tracks) by a method of microtunneling   with the use of AVN 1200 C tunnel-driving complex;
- laying of pipeline of  D1000 mm steel pipes by a method of mechanized shield driving by PS 2.15 mechanized complex;
- construction of 65 extinguishing chambers and viewing wells.
Construction water level reduction and freezing of soils is performed

 
 
 
Detailed contact information
Question to the expert
Site map

© «Concern «KyivPidzemShlyakhBud», 2009
Site is created by ADV-DVA Company in 2009
Support and Promotion by WebPromotion
«Concern «KyivPidzemShlyakhBud»
Tel.:+380 (44) 253-00-02
tel: +380 (44) 253-00-31
office@kpsb.com.ua