Laying of outside engineering networks for the Redisson SAS Hotel construction
Construction period: July 2004 – October 2004
Laying of water supply and water drain outside networks along Jaroslavov Val Street and Honchara Street.
Methods of construction:
- open, a trench with wooden board supports;
- closed, raise tunneling and horizontal directional drilling.
Construction in the conditions of preservation of a historical city landscape, of a dense city construction.